POWER BOX
TURN ON ALL SWITCHES ON BOTTOM RIGHT SIDE, AS INDICATED. TURN OFF WHEN FINISHED
AIR CONDITIONER/HEATER
THE REMOTE CONTROL IS FOUND ABOVE THE SMALL FRIDGE IN THE KITCHEN.
TO TURN ON, STAND DIRECTLY UNDER EACH UNIT AND SELECT THE REQUIRED SETTING, ETC. PLEASE DO NOT SET OVER 22C
GARBAGE
- REGULAR RUBBISH IS TO BE PLACED IN GARBAGE BAGS BEFORE PLACING IN GREEN COUNCIL BINS.
- RECYCLABLE ITEMS TO BE PUT IN YELLOW RECYCLE BINS ONLY
HOT WATER UNIT
THE UNIT IS SITUATED ON THE WALL ABOVE THE SINK. SIMPLY SWITCH ON AT THE POWER POINT NEARBY.
BUT FOR MAIN HOT WATER, PLEASE TURN ON HOT WATER SWITCH AT POWER BOARD
STOVE
THE TIMER MUST BE SET TO OPERATE
FAIRY LIGHTS
THE SWITCH IS ON THE LEFT HAND SIDE OF THE STAGE
KEY RETURN
PLACE KEY IN SECURITY BOX.
PLEASE DO NOT TOUCH EQUIPMENT AT THE BACK THAT BELONGS TO CLASSES
Finally: Read the Conditions of Hire form that you have agreed to by signing. Return of your bond is dependent on adhering to this!
TURN ON ALL SWITCHES ON BOTTOM RIGHT SIDE, AS INDICATED. TURN OFF WHEN FINISHED
AIR CONDITIONER/HEATER
THE REMOTE CONTROL IS FOUND ABOVE THE SMALL FRIDGE IN THE KITCHEN.
TO TURN ON, STAND DIRECTLY UNDER EACH UNIT AND SELECT THE REQUIRED SETTING, ETC. PLEASE DO NOT SET OVER 22C
GARBAGE
- REGULAR RUBBISH IS TO BE PLACED IN GARBAGE BAGS BEFORE PLACING IN GREEN COUNCIL BINS.
- RECYCLABLE ITEMS TO BE PUT IN YELLOW RECYCLE BINS ONLY
HOT WATER UNIT
THE UNIT IS SITUATED ON THE WALL ABOVE THE SINK. SIMPLY SWITCH ON AT THE POWER POINT NEARBY.
BUT FOR MAIN HOT WATER, PLEASE TURN ON HOT WATER SWITCH AT POWER BOARD
STOVE
THE TIMER MUST BE SET TO OPERATE
FAIRY LIGHTS
THE SWITCH IS ON THE LEFT HAND SIDE OF THE STAGE
KEY RETURN
PLACE KEY IN SECURITY BOX.
PLEASE DO NOT TOUCH EQUIPMENT AT THE BACK THAT BELONGS TO CLASSES
Finally: Read the Conditions of Hire form that you have agreed to by signing. Return of your bond is dependent on adhering to this!